Wawasan Professional Training Centre
Construction | Engineering | Management | Information Technology
Past seminar
Date Seminar Panel Speaker Pictures
30-10-2015 WAWASAN CEO Sharing No.1 (Half Day) Ir. Shim Woon Choon
Picture
19-07-2014 Site Supervision Of Piling Works (1 Day) Ir. Neoh Cheng Aik
Picture
21-12-2013 Workshop on Case Histories of Building Foundation Distress/Failures (1 Day) Ir. Neoh Cheng Aik
Picture
23-11-2013 Workshop on Practical Design, Installation & Testing of Driven Piles, Bored Piles & Micropiles (1 Day) Ir. Neoh Cheng Aik
Picture
28-09-2013 Workshop on Earthworks & Engineered Fills (1 Day) Ir. Neoh Cheng Aik
Picture
22-06-2013 Workshop on Case Histories of Slope Failures-Investigation, Analysis & Remediations (1 Day) Ir. Neoh Cheng Aik
Picture
22-12-2012 Workshop on Design & Construction of Slopes & Earth Retaining Structures (1 Day) Ir. Neoh Cheng Aik
Picture
24-11-2012 Workshop on Practical Design, Installation & Testing of Driven Piles, Bored Piles & Micropiles (1 Day) Ir. Neoh Cheng Aik
Picture
17-12-2011 Workshop on Case Histories of Building Foundation Failures (1 Day) Ir. Neoh Cheng Aik
Picture
10-12-2011 Workshop on Case Histories of Design & Construction of Bored Piles (1 Day) Ir. Neoh Cheng Aik
Picture
12-11-2011 Workshop on Design & Construction of Micropiles (1 Day) Ir. Neoh Cheng Aik
Picture
22-10-2011 Workshop on Case Histories of Slope Failures (1 Day) Ir. Neoh Cheng Aik
Picture
07-10-2011 Workshop on Case Histories of Design & Construction of Displacement Pile Foundations (1 Day) Ir. Neoh Cheng Aik
Picture
16-07-2011 Workshop On Bored Pile Foundation Design (1 Day) Ir. Neoh Cheng Aik
Picture
18-06-2011 Workshop On Planning Scope Of Site Investigation For Civil Engineering Projects (1 Day) Ir. Neoh Cheng Aik
Picture
21-05-2011 Workshop On Design & Construction Of Shallow Foundation For Building Projects (1 Day) Ir. Neoh Cheng Aik
Picture
30-04-2011 Workshop on Earthworks & Engineered Fills (1 Day) Ir. Neoh Cheng Aik
Picture
16-04-2011 Engineering with Geosynthetics (Reschedule) (1 Day) Ir. Dr. Loke Kean Hooi
Picture
18-12-2010 Workshop on Design & Construction of Micropiles & Hand-Dug Caissons (1 Day) Ir. Neoh Cheng Aik
Picture
16-10-2010 Workshop on Ground Improvement Techniques-Design & Construction Case Histories (1 Day) Ir. Neoh Cheng Aik
Picture
25-09-2010 Workshop on Design & Construction of Displacement Pile Foundations (1 Day) Ir. Neoh Cheng Aik
Picture
06-08-2010 Workshop on HEC-RAS Hydraulic Modeling Training Programme (2 days) Ir. Lim Sin Poh
Picture
31-07-2010 Workshop on Slope Stabilization by Soil Nailing & Guniting (1 Day) Ir. Neoh Cheng Aik
Picture
28-05-2010 Workshop on Carbon Fiber Reinforced Polymer (CFRP) for Concrete Strengthen (1 Day) Dr. Mohamed A. El-Reedy
Picture
27-05-2010 Workshop on Foundation Under Machines (1 Day) Dr. Mohamed A. El-Reedy
Picture
24-05-2010 Advance Materials For Construction, Repair And Maintenance Of Reinforced Concrete Structures (2 Days) Dr. Mohamed A. El-Reedy
Picture
14-05-2010 Workshop on Planning Scope of Site Investigation for Civil Engineering Projects (2 Days) Ir. Neoh Cheng Aik
Picture
10-04-2010 Workshop on Design & Construction of Shallow Foundations for Building Projects (1 Day) Ir. Neoh Cheng Aik
Picture
27-03-2010 Workshop on Bored Pile Foundation Design (1 Day) Ir. Neoh Cheng Aik
Picture
08-01-2010 Advance Excel for Engineers (2 Days) Mr. Chee Shai Choon
Picture
19-12-2009 Workshop on Design & Construction Case Histories for Slope Stabilization Works Using Geosynthetics (1 Day) Ir. Dr. Mohd. Asbi Bin Othman
Ir. Neoh Cheng Aik
Ir. Low Tian Huat
Ir. Lee Eng Choy
Picture
31-10-2009 Workshop on RC Slab Design Using Welded Mesh-A More Economical Design Solution (Half Day) Ir. Yap Kong Lim
Picture
24-10-2009 Workshop on Design of Retaining Wall for Civil Engineering Projects (1 Day) Ir. Neoh Cheng Aik
Picture
01-10-2009 Assessment of Defects in Concrete Structures and Evaluation of Safety of Concrete Infrastructure (3 Days) Dr. Mohamed A. El-Reedy
Picture
12-09-2009 Workshop on Building Foundation Failure and Mitigation (1 Day) Ir. Neoh Cheng Aik
Picture
22-08-2009 Workshop on Bored Pile and Micropile Foundation Design (1 Day) Ir. Neoh Cheng Aik
Picture
08-08-2009 Engineering with Geosynthetics (1 Day) Ir. Dr. Loke Kean Hooi
Picture
04-07-2009 Business Networking No. 4 (In Conjunction with Launcing of REFINANCING NOW book (Half day) Mr. Mohamad Ismail
Mr. Donovan Chan
Mr. Brian Lee
Mr. RodneyToh
Mr. Henchard Too
Mr. Kam Wei Tsung
Picture
30-05-2009 Workshop on Design of Slope Stabilization Works (1 Day) Ir. Neoh Cheng Aik
Picture
18-04-2009 Workshop on Planning Scope of SI for Civil Engineering Projects (1 Day) Ir. Neoh Cheng Aik
Picture
04-04-2009 Workshop on Pile Foundation Design-Additional Workshop (1 Day) Ir. Neoh Cheng Aik
Picture
28-03-2009 Workshop on Pile Foundation Design (1 Day) Ir. Neoh Cheng Aik
Picture
10-02-2009 Bored Pile Construction And Implementation (3 Days) Ir. Neoh Cheng Aik
Picture
13-12-2008 Geosynthetics In Civil And Environment Engineering (1 Day) Ir. Neoh Cheng Aik
Ir. Dr. Mohd. Asbi Bin Othman
Ir. Lee Eng Choy
Ir. Low Tian Huat
Picture
06-12-2008 Case Histories Of Slope Failures - Investigation, Failure Analysis And Recommended Remedies (1 Day) Ir. Neoh Cheng Aik
Picture
08-11-2008 Planning And Interpretation Of Site Investigation For Civil Engineering Projects (1 Day) Ir. Neoh Cheng Aik
Picture
24-10-2008 Design And Specification Of Geosynthetics (2 Days) Ir. Dr. Loke Kean Hooi
Picture
20-09-2008 Building Foundation Failure Prevention And Mitigations (1 Day) Ir. Neoh Cheng Aik
Picture
29-08-2008 Methodologies Of Creating Blue Ocean Opportunities For Professionals And Managers (1 Day) Mr. Lee Weng Kai
Picture
09-08-2008 Practical Design, Installation And Testing Of Driven Piles, Bored Piles And Micropiles (1 Day) Ir. Neoh Cheng Aik
Picture
29-06-2008 Wawasan Entrepreneur Group (Business Networking No. 3) (Half Day) (Half day) Ms. Grace Wang
Ms. Lenny Chiah Len Fong
Mr. Leremy Gan
Picture
31-05-2008 Case Histories of Slope Stabilization and Repair (1 Day) Ir. Neoh Cheng Aik
Picture
03-05-2008 Ground Treatment Techniques - Engineering Problems and Solutions For Soft Ground (1 Day) Ir. Neoh Cheng Aik
Picture
27-04-2008 Wawasan Entrepreneur Group (Business Networking No. 2) (Half Day) (Half day) Ms. Grace Wang
Ms. Lenny Chiah Len Fong
Picture
26-04-2008 Methodologies Of Creating Blue Ocean Opportunities For Professionals And Managers (1 Day) Mr. Lee Weng Kai
Picture
05-04-2008 Design And Specification Of Geosynthetics (2 Days) Ir. Dr. Loke Kean Hooi
Picture
29-03-2008 Planning And Interpretation Of Site Investigation For Civil Engineering Projects (1 Day) Ir. Neoh Cheng Aik
Picture
22-03-2008 Geological Considerations in Slope Engineering (1 Day) Assoc. Prof. Dr. Tajul Anuar Bin Jamaluddin
Picture
15-03-2008 High Performance Graduate Seminar Serial No. 1 (HPG) (Half Day) Mr. Lee Weng Kai
Picture
24-02-2008 Wawasan Entrepreneur Group Business (Networking No. 1) (Half Day) Mr. Leremy Gan
Mr. Lee Weng Kai
Picture
23-02-2008 Current Practice Of Waterproofing Systems In Malaysia & Introduction Of New Technology In Waterproofing (Half Day) Mr. Jerry W. Fulcher
Picture
22-02-2008 Building Foundation Failure Prevention (1 Day) Ir. Neoh Cheng Aik
Picture
26-01-2008 Practical Aspects In Slope Design & Construction (1 Day) Ir. Neoh Cheng Aik
Picture
05-01-2008 Practical Design, Installation & Testing Of Driven Piles, Bored Piles & Micropiles (1 Day) Ir. Neoh Cheng Aik
Picture
08-12-2007 Design And Construction Of Walls (1 Day) Ir. Neoh Cheng Aik
Picture
24-11-2007 Construction Project Management (2 Days) Professor Dr. Hamzah Abdul Rahman
Dr. Mohammed Ali Berawi
Ir. Mohd Zaifuddin Idris
Mr. Syed Abdul Fattah Alzawawi
Picture
17-11-2007 Pile Testing-Static And PDA Load Tests (1 Day) Ir. Neoh Cheng Aik
Mr. Wai Yekong
Picture
27-10-2007 Soil Nailing And Guniting-Design, Installation And Testing (1 Day) Ir. Neoh Cheng Aik
Picture
06-10-2007 Building Foundation Failure Prevention (1 Day) Ir. Neoh Cheng Aik
Picture
28-07-2007 Practical Aspects in Slope Design & Construction And Common Ground Treatment Methods--Analysis, Design & Construction Controls (2 Days) Ir. Lee Eng Choy
Ir. Neoh Cheng Aik
Picture
30-06-2007 Practical Design, Installation & Testing of Driven piles, Bored piles and Micropiles. () Ir. Neoh Cheng Aik
Picture
19-05-2007 Dynamics Of Managing Construction Contracts () Dr. Mohammed Ali Berawi
Professor Dr. Hamzah Abdul Rahman
Mr. Tn. Hj. Basar Juraimi
Professor Dr. Peter C Woods
Picture
21-04-2007 Construction Delays – Issues, problems and methods to overcome them () Professor Dr. Hamzah Abdul Rahman
Mr. Mohd Suhaimi Mohd Danuri
Picture