| E025 | Construction | Bored Pile Construction And Implementation | 3 Days |
| - |
|
|||||
Introduction
All Session for Day 1
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences?(if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
All Session for Day 2
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences?(if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
All Session for Day 2
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Who are the speakers?
Objectives
Benefits
Sessions and Scopes
| Session | Scope | Speaker |
|
Session 1 Day 1 0830-0900
|
Registration
|
|
|
Session 2 Day 1 0900-1700
|
ALL SECTION -Day 1
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI) • The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling |
Ir. Neoh Cheng Aik |
|
Session 3 Day 1 1000-1025
|
Refreshment
|
|
|
Session 4 Day 1 1300-1400
|
Lunch
|
|
|
Session 5 Day 1 1535-1600
|
Refreshment
|
|
|
Session 6 Day 2 0900-1700
|
ALL SECTION -Day 2
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI) • The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling |
Ir. Neoh Cheng Aik |
|
Session 7 Day 2 1000-1025
|
Refreshment
|
|
|
Session 8 Day 2 1300-1400
|
Lunch
|
|
|
Session 9 Day 2 1535-1600
|
Refreshment
|
|
|
Session 10 Day 3 0900-1700
|
Visit Site
|
Date, Time, Venue, and Fee
| Date and time | : | 10-02-2009 (Tuesday) 0900 - 1700
11-02-2009 (Wednesday) 0900 - 1700 12-02-2009 (Thursday) 0900-1700 |
| Venue | : | Setia Learning Academy, Setia Alam |
| Location map | : | See location map |
| Fee | : |
Who should attend?
Civil Engineer, Geotechnical Engineer, Structural Engineers, Building & Piling Contractors, Consultants, Project Manager, RE.
Course related information (FREE)
Additional notes
• Certificate of CPD Point with full attendance
• 6 tea breaks & 3 lunch provided
• Handout notes
• 6 tea breaks & 3 lunch provided
• Handout notes