Wawasan Professional Training Centre
Construction | Engineering | Management | Information Technology
E025 Construction Bored Pile Construction And Implementation 3 Days

-
Introduction
All Session for Day 1
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences?(if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling

All Session for Day 2
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Who are the speakers?
Qualification : • Bachelor Engineering (Hon) from University of Malaya.
• He was Vice President of IEM. (2004-2006)
Strength : • Geotechnical design for foundations, walls and slopes and as an independent geotechnical design checker.
• Published more than 50 technical papers on geotechnical and road engineering in various journals & bulletins.
Current job : • Director of E-Geo Consultant Sdn. Bhd.
Biodata : Ir. Neoh is Vice Precident of IEM (2004-2006), Chairman of Technical Committee for Geotechnics (TC5), Road Engineering Association Malaysia, (1997-2006) and also Chairman of IEM/CIDB/JPN organising committee.

He joined PWD Malaysia (74'-98') for 25 Years after graduated from UM (1974). He is currently (2000-2007) the Director of E-Geo Consultant Sdn. Bhd. who mainly involved in geotechnical design for foundations, walls and slopes and as an independent geotechnical design checker.

He has published more than 50 technical papers on geotechnical and road engineering in various journals & bulletins. He also presented in many local seminars and conferences.
 
Objectives
Benefits
Sessions and Scopes
Session Scope Speaker
Session 1
Day 1
0830-0900
Registration
Session 2
Day 1
0900-1700
ALL SECTION -Day 1
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile? Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Ir. Neoh Cheng Aik
Session 3
Day 1
1000-1025
Refreshment
Session 4
Day 1
1300-1400
Lunch
Session 5
Day 1
1535-1600
Refreshment
Session 6
Day 2
0900-1700
ALL SECTION -Day 2
• Introduction of Bored pile. Some basic design concept.
• Works specification for bored piles. What type of site/soil conditions suitable for bored pile?
Misleading Soil Investigation: Consequences? (if actual boring depth very much more/less than as shown in SI)
• The different type of bored pile drilling machine and other related equipments? The scquence of bored pile construction. Different type of bored pile auger using in different soil/rock condition? The purpose and usage of temporary casing? The problem may encounter during the inserting & withdrawer of temporary casing? In what situation we need the usage of bentonite to stabilize the wall during drilling? The right method to insert reinforcement cage? How to determine the depth of borepile? How to ensure the base of the borepile is cleaned? The definition of rock in piling
Ir. Neoh Cheng Aik
Session 7
Day 2
1000-1025
Refreshment
Session 8
Day 2
1300-1400
Lunch
Session 9
Day 2
1535-1600
Refreshment
Session 10
Day 3
0900-1700
Visit Site
Date, Time, Venue, and Fee
Date and time : 10-02-2009 (Tuesday) 0900 - 1700
11-02-2009 (Wednesday) 0900 - 1700
12-02-2009 (Thursday) 0900-1700
Venue : Setia Learning Academy, Setia Alam
Location map : See location map
Fee :
Who should attend?
Civil Engineer, Geotechnical Engineer, Structural Engineers, Building & Piling Contractors, Consultants, Project Manager, RE.
Course related information (FREE)
Additional notes
• Certificate of CPD Point with full attendance
• 6 tea breaks & 3 lunch provided
• Handout notes
Class capacity = 50