| E024 | Engineering | Workshop on Design of Slope Stabilization Works | 1 Day |
| BEM Approved 8 CPD Points With Full Attendance |
Normal Price RM 650.00
(If Register Online RM 500.00 Only before 16-05-2009) |
|
||||
Introduction
SECTION 1 (9.00-10.45)
• Methods to assess probable causes of slope failures & information required
• SI methods & design parameters for slope repair/stabilization works.
• Methods of slope stabilization: selection chart, checklist, required parameters, applications & limitations, etc.
• Works specification & instrumentation
• Sample of construction details & scope of QC tests, etc., of typical slope stabilization methods will be given as a guide.
SECTION 2 (11.00-13.00)
• Case Study 1: Three (3) failed cut slopes of various heights and site conditions with site plan plus x-sections and photos will be given. Participants are required:
1. Based on information given, describe failure modes and determine the likely/probable causes of failure. Brief SI results will be given.
2. Based on selection chart, recommend suitable methods of slope stabilization. Discussion design concept involved. Compare the pros and cons for each feasible method. What are the critical design parameters and performance requirements? What shall be the scope of design validation?
SECTION 3 (14.00-15.30)
• Case Study 2: As case study 1, but for 3 failed filled slopes
SECTION 4 (15.45-17.00)
• Case Study 3: As case study 1, but for retaining wall sites.
• Methods to assess probable causes of slope failures & information required
• SI methods & design parameters for slope repair/stabilization works.
• Methods of slope stabilization: selection chart, checklist, required parameters, applications & limitations, etc.
• Works specification & instrumentation
• Sample of construction details & scope of QC tests, etc., of typical slope stabilization methods will be given as a guide.
SECTION 2 (11.00-13.00)
• Case Study 1: Three (3) failed cut slopes of various heights and site conditions with site plan plus x-sections and photos will be given. Participants are required:
1. Based on information given, describe failure modes and determine the likely/probable causes of failure. Brief SI results will be given.
2. Based on selection chart, recommend suitable methods of slope stabilization. Discussion design concept involved. Compare the pros and cons for each feasible method. What are the critical design parameters and performance requirements? What shall be the scope of design validation?
SECTION 3 (14.00-15.30)
• Case Study 2: As case study 1, but for 3 failed filled slopes
SECTION 4 (15.45-17.00)
• Case Study 3: As case study 1, but for retaining wall sites.
Who are the speakers?
Objectives
Benefits
Sessions and Scopes
| Session | Scope | Speaker |
|
Session 1 Day 1 0830-0900
|
Registration
|
|
|
Session 2 Day 1 0900-1045
|
SECTION 1
• Methods to assess probable causes of slope failures & information required
• SI methods & design parameters for slope repair/stabilization works. • Methods of slope stabilization: selection chart, checklist, required parameters, applications & limitations, etc. • Works specification & instrumentation • Sample of construction details & scope of QC tests, etc., of typical slope stabilization methods will be given as a guide. |
Ir. Neoh Cheng Aik |
|
Session 3 Day 1 1045-1100
|
Refreshment
|
|
|
Session 4 Day 1 1100-1300
|
SECTION 2
• Case Study 1: Three (3) failed cut slopes of various heights and site conditions with site plan plus x-sections and photos will be given. Participants are required:
1. Based on information given, describe failure modes and determine the likely/probable causes of failure. Brief SI results will be given. 2. Based on selection chart, recommend suitable methods of slope stabilization. Discussion design concept involved. Compare the pros and cons for each feasible method. What are the critical design parameters and performance requirements? What shall be the scope of design validation? |
Ir. Neoh Cheng Aik |
|
Session 5 Day 1 1300-1400
|
Lunch
|
|
|
Session 6 Day 1 1400-1530
|
SECTION 3
• Case Study 2: As case study 1, but for 3 failed filled slopes
|
Ir. Neoh Cheng Aik |
|
Session 7 Day 1 1530-1545
|
Refreshment
|
|
|
Session 8 Day 1 1545-1700
|
SECTION 4
• Case Study 3: As case study 1, but for retaining wall sites.
|
Ir. Neoh Cheng Aik |
|
Session 9 Day 1 1700-1715
|
Question & Answer
|
|
|
Session 10 Day 1 1715-1730
|
Distribution of Certificate
|
Date, Time, Venue, and Fee
| Date and time | : | 30-05-2009 (Saturday) : 0900 - 1700 |
| Venue | : | Seminar Hall,Ground Floor, Wisma Wawasan,
Address No.19-0, Jalan PJS8/12, Dataran Mentari, Bandar Sunway, 46150 Petaling Jaya, Selangor Darul Ehsan |
| Location map | : | See location map |
| Fee | : | Normal Price RM 650.00
(If Register Online RM 500.00 Only before 16-05-2009) |
Who should attend?
Civil Engineers, Geotechnical Engineers, Structural Engineers, Building Contractors, Consultants, Project Managers, RE.
Course related information (FREE)
Additional notes
• Certificate of CPD Point with full attendance
• 2 tea breaks & 1 lunch provided
• Handout notes
• 2 tea breaks & 1 lunch provided
• Handout notes