| E015 | Engineering | Case Histories of Slope Stabilization and Repair | 1 Day |
| BEM Approved 6 CPD Points With Full Attendance |
RM290.00 for Graduate Engineer
RM350.00 for Professional Engineer |
|
||||
Introduction
Section 1
Section 1
• Overview of slope stabilization and repair: engineering problems and principles, investigation scope,methods and procedure;factors governing selection of stabilization methods.
• Selected enlightening major landslide case histories:findings about causes of failures and lessons learnt.
Section 2
• Case histories (5 cases) of cut slope failures: desription and classification, field investigation and findings, proposals for remedy and stabilization including detail justifications with calculations, analysis, construction details and design validation schemes.
Section 3
• Case histories (3 cases) of fill slope failures: background information, failure description, field investigation and testing/ monitoring, remedial/stabilization design with necessary analysis and calculations to shown compliance of design criteria, construction details,QC and scope of design validation.
• Case histories (3 cases) of failures for road embankment over soft ground: failure description, field investigation and findings, proposed stabilization with necessary design analysis and construction details.
Section 4
• Case histories (5 cases)of slope erosin and repair: failure desription, investigation and findings, proposed remedy with technical justification, construction details.
• Slope protection design checklist and slope protection methods.
Section 1
• Overview of slope stabilization and repair: engineering problems and principles, investigation scope,methods and procedure;factors governing selection of stabilization methods.
• Selected enlightening major landslide case histories:findings about causes of failures and lessons learnt.
Section 2
• Case histories (5 cases) of cut slope failures: desription and classification, field investigation and findings, proposals for remedy and stabilization including detail justifications with calculations, analysis, construction details and design validation schemes.
Section 3
• Case histories (3 cases) of fill slope failures: background information, failure description, field investigation and testing/ monitoring, remedial/stabilization design with necessary analysis and calculations to shown compliance of design criteria, construction details,QC and scope of design validation.
• Case histories (3 cases) of failures for road embankment over soft ground: failure description, field investigation and findings, proposed stabilization with necessary design analysis and construction details.
Section 4
• Case histories (5 cases)of slope erosin and repair: failure desription, investigation and findings, proposed remedy with technical justification, construction details.
• Slope protection design checklist and slope protection methods.
Who are the speakers?
Objectives
Benefits
Sessions and Scopes
| Session | Scope | Speaker |
|
Session 1 Day 1 0830-0900
|
Registration
|
|
|
Session 2 Day 1 0900-1100
|
Section 1
• Overview of slope stabilization and repair: engineering problems and principles, investigation scope,methods and procedure;factors governing selection of stabilization methods.
• Selected enlightening major landslide case histories:findings about causes of failures and lessons learnt. |
Ir. Neoh Cheng Aik |
|
Session 3 Day 1 1000-1025
|
Refreshment
|
|
|
Session 4 Day 1 1100-1300
|
Section 2
• Case histories (5 cases) of cut slope failures: desription and classification, field investigation and findings, proposals for remedy and stabilization including detail justifications with calculations, analysis, construction details and design validation schemes.
|
Ir. Neoh Cheng Aik |
|
Session 5 Day 1 1300-1400
|
Lunch
|
|
|
Session 6 Day 1 1400-1535
|
Section 3
• Case histories (3 cases) of fill slope failures: background information, failure description, field investigation and testing/ monitoring, remedial/stabilization design with necessary analysis and calculations to shown compliance of design criteria, construction details,QC and scope of design validation.
• Case histories (3 cases) of failures for road embankment over soft ground: failure description, field investigation and findings, proposed stabilization with necessary design analysis and construction details. |
Ir. Neoh Cheng Aik |
|
Session 7 Day 1 1535-1600
|
Refreshments
|
|
|
Session 8 Day 1 1600-1700
|
Section 4
• Case histories (5 cases)of slope erosin and repair: failure desription, investigation and findings, proposed remedy with technical justification, construction details.
• Slope protection design checklist and slope protection methods. |
Ir. Neoh Cheng Aik |
|
Session 9 Day 1 1700-1715
|
Question & Answer
|
|
|
Session 10 Day 1 1700-1730
|
Distribution of Certificate
|
Date, Time, Venue, and Fee
| Date and time | : | 31-05-2008 (Saturday) : 0900 - 1700 |
| Venue | : | Seminar Hall,Ground Floor, Wisma Wawasan,
Address No.19-0, Jalan PJS8/12, Dataran Mentari, Bandar Sunway, 46150 Petaling Jaya, Selangor Darul Ehsan |
| Location map | : | See location map |
| Fee | : | RM290.00 for Graduate Engineer
RM350.00 for Professional Engineer |
Who should attend?
Civil Engineer, Geotechnical Engineers, Engineering Consultants, Consultants, Project Manager,RE, Building Contractor
Course related information (FREE)
Additional notes
• Certificate of CPD Point with full attendance
• 2 tea breaks & 1 lunch provided
• Handout notes
• 2 tea breaks & 1 lunch provided
• Handout notes









